Managing Bottlenecks
Methodology
This section describes the approach we used to address the problem of poor bottleneck management. The following steps were proposed and followed:
- Conduct time studies and establish standard times
- Develop the simulation model
- Verify and validate the simulation model
- Quantitatively analyse the mixed model assembly lines
- Conduct bottleneck analysis
- Make decisions to optimise bottleneck management