Managing Bottlenecks

Methodology

This section describes the approach we used to address the problem of poor bottleneck management. The following steps were proposed and followed:

  • Conduct time studies and establish standard times
  • Develop the simulation model
  • Verify and validate the simulation model
  • Quantitatively analyse the mixed model assembly lines
  • Conduct bottleneck analysis
  • Make decisions to optimise bottleneck management