Scope Planning
Image Descriptions
Figure 9.2 image description: A project manager develops a Scope Management Plan by taking the project charter, organizational memory, and the project plan and applying the following techniques and tools:
- Calls on past project experience
- Uses scope management templates (SOS, WBS, Scope Management Plan)
- Uses Communication skills (for negotiating with and educating clients)
Figure 9.3 image description:
0.0 Clean Room
- 1.0 Mop floor.
- 1.1 Get mop and bucket out.
- 1.2 Mix cleaner with water in bucket.
- 1.3 Rinse out bucket and mop.
- 2.0 Dust
- 2.1 Coffee table
- 2.2 Blinds
- 3.0 Vacuum
- 3.1 Get vacuum out of closet
- 3.2 Vacuum carpet
- 3.3 Empty bag
- 3.4 Connect hose and plug
- 4.0 Pick up floor
- 4.1 Toys
- 4.1.1 Put toys in box
- 4.2 Clothes
- 4.2.1 Hang up in closet
- 4.1 Toys
- 5.0 Clean curtains
- 5.1 Remove curtains
- 5.2 Take to cleaners
- 5.3 Hang curtains