Identifying Bottlenecks

Identification of bottlenecks and analysis of the state before applying lean management

Conclusion

On the basis of the carried out preliminary analysis it was stated that the lack of proper organization of the place and time of work, lack of proper preparation in terms of content and equipment, lack of proper work standards, and what unfortunately in the case of the RZ machine are very important factors of losses. Those factors play a very important role in the analysed changeover. The amount of time lost on the process of screwing in and removing the screws is also important. A positive aspect of the changes that should be carried out is the fact that they are not issues that require large investments.