Evaluating Capacity
Example: Implementation of New Operational Availability Model into Toyota USA
We have applied for new operational availability model into Toyota in U.S.A. (Toyota USA) with a 4 step system as shown in Fig. 5.
Figure 5. Model to link impact of multiple Steps
Where is Short time to Step 2 from previous steps.
is equipment downtime at Step 2
is Short time to Step 3 from Step 2
Introduced Impact of Station 2=
is equipment downtime at Step 1
is Short time to Step 2 from Step 1
is the overall equipment impact to the system shown in Fig.5.